SH-66 Bridge
The SH-66 Bridge project in Oklahoma, completed in partnership with Sherwood Construction, included both permanent and temporary fencing to support secure and efficient site operations. The scope consisted of 1,089 feet of permanent fencing and 400 feet of temporary fencing, providing layered protection throughout construction and long-term infrastructure security.
The permanent system featured 10-foot-tall black chain link fencing mounted on the parapet wall with Schedule 80 posts angled at 60 degrees for enhanced strength and security. The temporary fencing included custom posts and chain link tailored to the active construction environment.
Safety remained a top priority throughout the project, with zero injuries recorded, reflecting a strong commitment to jobsite safety and operational excellence.
This project also required coordination within a highly regulated transportation corridor, including adherence to railroad safety protocols and BFSN certification standards. Close collaboration with all stakeholders ensured work was completed safely, efficiently, and in compliance with all applicable requirements.
Project at-a-glance:
Location: Claremore, Oklahoma
Total Footage: 1,089’ Permanent Fence/400’ of Temporary Fence
Material: 10’ Tall Black Chain Link - On Top of Parapet Wall with Sch80 posts at a 60 Degree angle, Custom Temporary Fence Posts and Chain Link
Owner: Oklahoma Department of Transportation
Awards: 2026 ABC of Arkansas EIC Speciality Construction, 2025 ABC of Oklahoma EIC Speciality Construction
Safety: 0 - reported injuries